Engineering & Construction Planning

WTI per­forms plan­ning and en­gi­nee­ring ser­vi­ces for new plants and re­con­struc­tion pro­jects in the nu­cle­ar field.

The en­gi­nee­ring ser­vi­ces do not only com­prise plan­ning ser­vi­ces and prepa­ra­tion of ap­pli­ca­tion docu­ments but also in­clude pro­ject con­trol­ling, su­per­vi­sion and turn key con­struc­tion.

Main topics

  • Buil­ding de­sign, con­cep­tual de­sign, pro­ject en­gi­nee­ring and su­per­vi­sion du­ring con­struc­tion, ge­ne­ral engi­nee­ring ser­vi­ces
  • Pro­cess engi­nee­ring, plant con­struc­tion with do­cu­men­ta­tion of the equip­ment, design of ven­ti­la­tion sys­tems
  • Re­con­struc­tion and de­com­mis­sio­ning plan­ning
  • Struc­tural engi­nee­ring, struc­tural ana­ly­sis, 2D- and 3D-en­gi­nee­ring, coor­di­na­tion of system in­ter­fa­ces
  • Design of fa­ci­li­ties for the sto­rage of spent fuel in casks and for the sto­rage of ra­dio­ac­tive waste

Interim storage facility for CASTOR®-casks

Handling of CASTOR®-casks

Hand­ling of waste con­tai­ners

Planning of Storage Facilities (WTI-Design)

  • Opti­mized con­struc­tion made of in-situ con­crete and pre­fa­bri­cated parts with pillars and roof frames
  • Passive cooling by natural con­vec­tion with air inlets and outlets
  • Ar­range­ment of casks in an array or tight ar­range­ment, de­pen­ding on the ther­mal out­put of the casks
  • Optimi­za­tion of plant se­cu­rity

WTI-Sto­rage Fa­ci­li­ty De­sign with se­para­ted halls for the combined sto­rage of spent fuel in CASTOR®-casks and radioactive waste in con­tai­ners

Project con­trolling and in­spec­tion du­ring con­struc­tion of in­de­pen­dent spent fuel sto­rage fa­ci­li­ties

Downloads

References Planning of waste storage facilities
References Planning of on-site interim storage facilities for fuel assemblies

We use cookies
We use cookies on our website. These are cookies exclusively necessary for operation of the website. Further information can be found in the privacy policy.